| WORKINGS | back to cruquius home page |
| introduction | engines | sites | engineers | foundries | information |
| engine index | E-0001 | ||||
| site index | S-0001 | ||||
| worked from | 1846 | 7 | to | 1862 | |
| engineer | T.Wicksteed | ||||
| pump size | 33 | ||||
| lift | |||||
| boiler number | 6 | ||||
| boiler capacity | |||||
| steam pressure | 40 | ||||
| speed | 8 | ||||
| duty | 72 | ||||
| notes | KMB Kew Bridge museum booklet, JTS#7p27ff, BEH. Pumping against 235' head, initially the speed was 9.5 spm which was found to be excessive. Contract stipulated duty 77m per bushel Newcastle small best quality, achieved duty fell slightly short of this. |
||||
|